Full Refurbishment

Safety Floor Replacement

Client

Private Residential Client

Location

London

Duration

6 Weeks

Project metrics

6

Bathrooms refurbished

6 wks

Programme duration

0

Void periods

100%

Quality pass rate

The Challenge

A full bathroom refurbishment was required across multiple units — involving complete strip-out, new waterproofing, tiling, sanitaryware, plumbing, extractor fans, and lighting — finished to a high-end specification within a fully occupied property.

Our Solution

Our multi-trade team delivered a phased bathroom refurbishment, completing each bathroom in sequence to ensure the property remained partially habitable. Works included full strip-out, tanking and waterproofing, new plumbing and electrical installations, large-format tiling, premium sanitaryware, and high-level extractor fans with LED lighting.

Key Results

  • All bathrooms transformed to a high-end hotel-grade specification.
  • Property remained partially occupied throughout the programme.
  • Zero defects at final snagging — 100% quality pass rate.
Discuss Your Project

Before & After

Drag the handle to reveal the transformation.

Safety Floor Replacement — After
Safety Floor Replacement — Before
BeforeAfter

Before and after comparison. Use left and right arrow keys to adjust the reveal position.

Safety Floor Replacement — final result