The Challenge
A complete kitchen refurbishment was required across multiple student accommodation units — involving full strip-out, new cabinetry, worktops, appliances, flooring, and electrical upgrades — all within a fully occupied building during the academic year.
Our Solution
Our multi-trade team delivered a phased kitchen refurbishment programme, working unit-by-unit to minimise disruption to residents. Each kitchen was stripped back to the structural shell, rewired, replumbed, and fitted with new units, worktops, appliances, and LVT flooring before a full redecoration and snagging.
Key Results
- All kitchens fully modernised with new cabinetry, appliances, and flooring throughout.
- Zero student relocations required — works carried out around occupant schedules.
- Completed on schedule with zero complaints from residents.